Simplex Projects has transformed in a short span from a piling contractor to a well groomed infrastructure construction company.

Having constructed over 70 Road and Rail-over-Bridges, over half a million square feet of residential and commercial buildings, power plants to chemical factories, multiplexes to shopping malls, Simplex Projects remains versatile in a range of activities ranging from ground engineering to electro-mechanical design, fabrication and installation at Simplex Projects, we possess some of the best engineering skills and that led to us have in our fold many 'First time in India' credits in the field of civil and mechanical construction. We also have the second largest fleet of Piling rigs in eastern part of the country, besides several other top class construction equipments and machineries.

Today, Simplex Projects offers a perfect blend of engineering skill and latest technologies for the infrastructure growth.

 
     
latest
The Chief Minister, Mr Buddhadeb Bhattacharjee inaugurated the city's first underground computerised car parking facility (for accommodating 280 cars) at the 133-year-old New Market (formerly Sir Stuart Hogg Market) site, here at Kolkata on April 20.  
 
Read More  
Revolutionary Fully Automatic Car Parking for Shopping Complex, Residential Complex, etc by...
 
 
 
Contact
 
Registered Office :

12/1, Nellie Sengupta Sarani,
Kolkata-700 087
Ph : 91-33-2252 7231/32
Fax : 91-33-2252 8013

Email: general@simplexprojects.com

Corporate Office :

12/1, Nellie Sengupta Sarani,
Kolkata-700 087
Ph : 91-33-2252 7231/32
Fax : 91-33-2252 8013

Email: general@simplexprojects.com

Reset
Click to view location
 

Regional Office (New Delhi) :

No.407/507, Skipper Corner,
88, Nehru Place, New Delhi-110019,
India
Phone:+91-11-2641-4100/3100
Fax:+91-11-2641-2100

Email: spl.delhi@simplexprojects.com

Or Use the Contact Form below:

Name:
Address:
City:
Country:
Zip:
Phone:
E-mail:
Fax:
Comments:
 
 

Incorporated in the year 1990 as a Public Limited Company. The Registered Office at Calcutta is controlling Project Sites all over India. In a short span of time of its working SPL has emerged as a renowned civil engineering and construction company.

The Company has procured a fleet of costruction equipment over this period.

It got Listed in the Bombay and National Stock Exchange at Rs. 180 and the stock prices reached its peak at Rs. 480.

 
 
Simplex Projects has complete access to technical collaborations with International construction giants for advanced techniques and research facilities in construction.
 
 
Management
 
 
Company Management
 
Sri B K MUNDHRA    .
Chairman & Non Executive Director
   
 
Sri SUDARSHAN MUNDHRA    .
Managing Director and CFO
   
 
Sri BHABYA NATH THAKUR    .
Independent Director
   
 
 

 

If there is LIFE, there is a Dream:

If there is a Dream, there is a Goal

If there is a Goal, there is a Road:

If there is a Road, there is a Distance

If there is a Distance, there is Determination:

If there Is Determination, there Is FAITH.


                                                                                                  -- SIMPLEX PROJECTS LTD.

If you want to see the animated ver of Value Statement.
Please Click here
Click to view Mission
 
 
Ongoing Projects
 
 

Construction of Road Over Bridge (Two lane at km. 393/5-7) on Koderma Station limit in replacement of LC Gate no. 34/A/T for East Central Railway. Total Length: 700 mt. 

 

Construction of Road Over Bridge (Length 1450 meters. approx.) in Bihar including Substructure, Superstructure including Approaches at Level Crossing no. 72 at Patna City for IRCON International Ltd.
 
Construction of Bridges (Package no.1 and 4) at Agartala, Tripura for PWD, Tripura. Package 1: Length - 410.30 mt. & Width - 10.0 mt. Package 4 : Length 214.60 mt. & width 10.0 mt.
 
Construction of Proposed ROB at Mithapur, Patna for East Central Railway in lieu of Level Crossing No. 79A on Main Line and Level Crossing no. (1) 4-Lane – Length 200 m, Width 20.23 mt. and (2) 2-Lane : Length 32 mt. & Width 11.53 mt.
 
Construction of Interchange at Dunlop Junction, B.T. Road (Right turn Flyover from P.W.D. Road to  B.T. Road at Dunlop Junction) for PWD, West Bengal. Total length : 640 mt. and width : 8.40 mt.
 
Construction of Flyover along Canal Bank Road across Main Arterial Road at New Town, Kolkata for at Rajarhat for HIDCO, Government of West Bengal. Total length : 580 mt. and width : 10 mt.
 
Construction of Balance Portion of Road Over Bridges (ROBs) at Mithapur, Patna in Bihar (Package XIII BW) including Rotary Portion for IRCON International Ltd. 4-Lane : Length -1.5 km, Width 17.2 mt. and  2-Lane : Length 1.10 km, width 8.5 mt.
 

Construction of Residential Accommodation for Army Welfare Housing Organization (AWHO) Project at VIP Road Teghoria, Kolkata-(Phase-II). Total Area: 323,263 sq.ft.

 
Construction of Sub-Structure and Superstructure work of proposed "Ecosuite" & 'City Centre-Annex' at New Town. Total Area: 278,100 sq.ft.
 
Infrastructural Development of Jawaharlal Nehru Institute of Medical Sciences [JNIMS]. (Sh. Construction of apartments for (i) Teaching Staff  (ii) Para Medical Staff of PWD, Manipur. Total Area: 129,120 sq.ft.
 
INTERNATIONAL CONTRACTS :-
 
We are presently executing a job for construction of 2000 Housing Units, Service Buildings & related infrastructure in Ghira, Shabiayt of Ashati Libya. Client : Great Socialist People’s Libyan Arab Jamahiriya Administrative Centers Development and Promotion Board. (USD 445 Million).
 
We are executing a job for construction of 2000 Housing Units, Infrastructure Utilities and external works in Wadi Al Mjinene, Libya. Client : Great Socialist People’s Libyan Arab Jamahiriya Administrative Centers Development and Promotion Board. (USD 392 Million).
 
Resumption of work at Libya
 
The Company has received an approval from the Government of Libya for resumption of its project for construction of 2000 housing units, service buildings and related infrastructure at Ghira, Shabiyat of Ashati, Libya which was stalled due to political unrest in Libya since February 2011.In view of the revised agreement the project is now to be completed within a period of 900 days from the date of initial payment of outstanding dues.
 
 
 

Driven Piles  -2832 nos. and Bored Piles - 2021 nos. of various diameter ranging from 500 to 700 mm for INDMAX(FCC) & PRU for Paradip Refinery Project at Paradip, Orissa.

 
1000/1200 mm Diameter Piling works for Pkg-B for 400 KV D/C (Quad) Kishanganj- Patna Transmission Line  in Sikkim  NR/WR (Part - B) for Power Grid Corporation of India Limited.
 
Construction of Stone Piling at BTP, Barauni, Bihar for MRB Engineers & Contractors Pvt. Ltd., Chandigarh.
 
Piling & Stone Column works for Unit B of 2 x 250 MW extension project at Barauni TPPS, Begusarai, Bihar for BHEL for M/s. JMC Projects (India) Ltd.
 
Construction of Bored Piles, Pile Caps & Foundation works at Phase-1A (Heights) for Kolkata West International City Pvt. Ltd., a Project of Salim Group from Indonesia.
 
Construction of Piling Work and Deep Basement at 263, Rabindra Sarani, Kolkata for M/s. Lakhotia Infrastructure Pvt. Ltd.
 
Construction of Piling Works at TCS IT SEZ Park at Rajarhat, Kolkata for L&T - Shapoorji Pallonji & Co. Ltd. (JV).
 
 
 

We have also been awarded Consultancy Services for 12 projects to be executed around Delhi for Automatic and Fully Computerized Multi-level Car Parking Project under BOT scheme or otherwise for Delhi Municipal Corporation. The job includes complete evaluation and supervision for all parking systems for and on behalf of New Delhi Municipal Corporation.

 
Construction of Multilevel Car Park at Pan Bazar under BOT. Client – Guwahati Metropolitan Development Authority. Proposed ECS: 430 nos. 
 
Construction of Automated Multilevel Car Parking at former office campus of Joint Director, Health  Family Welfare, Kamrup, Assam.  Client – Guwahati Metropolitan Development Authority. No. of Puzzle (Lift and Slide) Parking : 240 cars.
 
Construction of Automated Multilevel Car Parking at Kankaria Estate, Ahmedabad. No. of cars : 250.
 
Construction of Automated Multilevel Car Parking under PPP at Jorbagh for CPWD. No. of Cars : 330.
 

**** For more details please visit our web site www.simparkinfrastructure.com

 
 
Construction of New canals at Arjun Sahayak Feeder Channel to Arjun Dam for Irrigation Deptt., Govt. of Upper Pradesh, Mahoba. Total length : 111 Kms. Width 30 mt. (average)
 
Construction of Sports Facility Block, Hockey Stadium, Warm up Pitch with two Level Basement for Parking, incl. Electrical, Fire Fighting & Protection, HVAC, Lifts etc. as a composite subcontract from M/s. China Railway Shisiju Group Corporation, for New Delhi Municipal Council for Commonwealth Games. 
 
Construction of Allopathic Medical College and Associated Hospital at Saharanpur, UP through OMAX Infrastructure and Construction (P) Ltd. for Uttar Pradesh Rajkiya Nirman Ltd.  Total Builtup Area : 1,519,463 sq. ft. 
 
Construction of Arunachal Pradesh Civil Secretariat Building at Itanagar. Total Area Constructed : 400,000 sq.ft. 
 
Construction of Capital Complex (Civil Secretariat Component) at Mantripukhri, Imphal. Total Area Constructed : 620,211 sq.ft. 
Completed Projects
 
 

Construction of 4-Lane Flyover 560 mtr. in length, each span of 28 mtr. in length, 11 nos. Twin Hollow Box Pre-Stressed Concrete Girder at Taratala for PWD, Govt. of West Bengal, Kolkata.

 

Construction of ROB work at Patna for IRCON International Ltd. and Nagarjuna Construction Co. Ltd. (Total length 2500 meters).
 
Construction of 560 M length ROB at Mithapur, Patna for Eastern Railway (Multiple Span of 39.1 Meters).
 
12 nos. ROBs varying from 500 to 750 Meters. long (total 12,000 M length of all Flyovers combined) at various locations in and around Ranchi and Dhanbad in the State of Jharkhand for Konkan Railway Corporation Ltd.  
 
Construction of approaches to Road Under Bridge for joining both the Service Roads of to Rampura crossing and Ring Road for Municipal Corporation of Delhi. Materials consumed : Concrete 9,662 cum., Steel – 1,813 M.T. Earthwork – 20,400 cum. Length of Underpass : 300 mt.
 

We had adopted Tunnel Shuttering System for Construction of an Integrated Housing Complex comprising of 576 Dwelling Units of different types and sizes on Turnkey Basis at Kolkata for Central Govt. Employees Welfare Housing Organization (CGEWHO). Total Area: 5,39,552 sq.ft.

 
Two Multi-Storied Complexes of 15 floors each have been constructed for Bengal Ambuja Housing Development Ltd. Total Area: 380,000 sq.ft.
 
First Prestigious Housing Project under the newly formed Government of Chattisgarh for Construction of 74 nos. Residential Quarters at Raipur, Chattisgarh. Total Area: 88,000 sq.ft. (Approx.)
 
For a Joint Venture project of Govt. of West Bengal and Gujarat Ambuja, we have completed building work (15 Storied "Udita Towers") x 3 towers and the Commercial Mall. Total Area: 380,000 sq.ft.
 

Construction work of Plant Buildings for new 1000 TPD Rotary Kiln Cement Plant at Jaintia Hills, Meghalaya for Hill Cement Co. Ltd. Materials consumed : Concrete – 23,000 cum, Steel – 2,273 M.T., Cement Silo - 15 m dia 42 mt. height, Blending Silo- 15 m dia 62 mt. height and Preheater 13 m square 69 mt. height.

 
Downhill Conveying System on Lump Sum Turnkey basis - Package II for NMDC Bailadia Iron Ore Project Deposit District Aantewada, Chhattisgarh for Sandvik Asia Limited. No. of Foundation 65, Earthwork – 57,466 cum, Backfill – 23,702 cum, Concrete – 2,618 cum and Steel – 283 M.T. 
 
Civil & Structural Work at Bihar Caustic & Chemicals Limited for 225 TPD Caustic Soda Membrane Cell Project at Garhwa Road for Bihar Caustic & Chemicals Ltd., Garhwa Road, Dist. Palamau,(Jharkhand). Material used : Concrete – 5,396 cum and Steel – 620 M.T.
 
Construction of Main Plant Building Civil and Structural, Pipe Rack, Utility Buildings, Ware houses Civil Works, Thermic Fluid Heaters, Captive Power Plant, Road and Drains and Allied works at Haldia, West Bengal for Dhunseri Petrochem & Tea Limited. Materials consumed – Concrete-20,000 cum, Steel-2,600 M.T. and Structural Steel – 1750 M.T. Total Area : 22,000 sq. mt, Total Height of Structure 48 mt.
 
Installation of Bored piles of 2000mm dia. for the construction of' Special' Transmission Towers of 400 KV Line at Ganga River Crossing near Kanpur for Uttar Pradesh State Electricity Board.
 
Executed Switch yard civil foundation, Control Room and other civil work at Siliguri, Krishnanagar & Pingla under West Bengal State Electricity Board and at Jalpaiguri under PGCIL.
 
Executed civil works for Main Plant & Switch yard for 36 MW Leimakhong Diesel Power Project in Manipur for BHEL.

Driven Pile work for construction of VIBGYOR TOWERS, a Housing Project at New Town, Action Area - I, Rajarhat, Kolkata  of National Building Construction Corporation Ltd.- 4200 nos. of 400/450 mm diameter. Total length 96,600 mtrs.(approx.)

 
Driven Piles, Pile Caps, Beams, Columns upto top of Basement roof slab including Basement Walls & Allied Sanitary & Plumbing works in connection with SANKALPA HOUSING PROJECT at Action Area 1B & 1C, New Town, Rajarhat, Kolkata in 4 Packages for West Bengal Housing Board. Total length 90,732 Mtrs. with diameter ranging from 400 - 600 mm. The pile length were 25 & 22.50 Mtrs. long.
 
Driven Pile - 2839 nos.  and Bored Piles 2,021 nos. of various diameter at Paradip Refinery Project site for Indian Oil Corporation Limited.
 
Driven Cast-in-Situ Pile for M/s Brahmaputra Cracker and Polymer Limited at Lepetkata, (Assam) - 5,324 nos. each of 450 mm in diameter.
 
Driven Pile - 958 nos. and Bored Piles - 1331 nos. of various diameter in Paradip Refinery Project for M/s. Indian Oil Corporation Limited (IOCL) at Orissa.
 
Bored Pile foundation for 3 nos. Tower locations of 400 KV S/C Bareilly-Moradabad Transmission Line - II of PGCIL - 48 nos. each of 750 mm diameter.
 
Cast-in-Situ Driven Piles for 30 MGD WTP at Baranagar, KMDA, Kolkata for M/s. Geo Miller & Co. Ltd. - 935 Nos. each of 450 mm diameter.
 
Piling work for LLDPE/HDPE at PATA for Petrochemical Complex - II project for GAIL (India) Limited -3152 nos. each of 450 mm diameter.
 

We have completed the world’s First "Fully Automatic Computerized Integrated Multi-level Automatic Car Parking System on a Radius" for 216 slots at the intersection of Park Street-Rawdon Street crossing on Built, Operate, Transfer (BOT) basis, which was commissioned a decade ago. 

 
We have also completed the first Underground Basement Structure using Top Down method for the second Fully Automatic Car Parking System in New Market on Built, Operate Transfer (BOT) basis for 300 slots in association with Kolkata Municipal Corporation, Kolkata and inaugurated by Hon’ble Chief Minister of West Bengal in April, 2007. 
 
Construction of Car Park Plaza at Ravangla, South Sikkim. Client– National Buildings Construction Corporation Ltd., Conventional Parking on Ramp Base.
 

**** For more details please visit our web site www.simparkinfrastructure.com

 

Revival of Star Theatre (a heritage structure) for Kolkata Municipal Corporation. Total no. of seats : 600.

 
Center for Computer & Communication Technology, Sikkim, a World Bank funded project for Govt. of Sikkim. Total Built-up Area : 16,410 sq. mt.
 
Design & Construction of office complex cum training centre / guest house etc. for Bharat Petroleum Corporation for Kolkata Improvement Trust. Total Built-up Aarea : 11,152 sq. mt.
 
School Building (G+4) of 150,000 sq. ft. with finishing works, boundary wall, landscaping, swimming pool, amphitheatre, internal roads and other utilities for Delhi Public School.
 
Construction of the New Market and Laxmi Market Complex in the Imphal city, Manipur for NBCC (a central government body).  Total area : 11,400 sq. mt. 
 
Construction of Civil Works for Institute of Neuro Science (Hospital) at Kolkata, West Bengal. Total area : 10,000 sq. mt.
 
Civil Work for Sub and Superstructure of Mall and Office Building at City Centre, Siliguri, for M/s. Ambuja Realty Development Ltd.  Total Built up Area : 350,000 sq. ft.
 
Construction of a 100 Bedded Hospital in the City of Thoubal for NBCC in Manipur. Total area : 9,000 Sq.mt.
 
Construction of Super-specialty Block at SGPGI Luknow for Upgradation of Sanjay Gandhi Post Graduate Institute of Medical Science for HSCC (India) Limited. Total Area constructed : 17,660 Sq. mt.
 
Construction of Canal works at Jaunpur, Raibareily for Government of Uttar Pradesh (Irrigation Department). Total Length : 119 kms. With Width of 40 mt. (average)
 
Addition / Alteration of Existing Stadium (Civil, Plumbing & Electrical Works) and Construction of New Block and Basement for New Delhi Municipal Council. Total Area : 30,000 sq. mt.  and No. of seats : 3,130.
 
Construction of Nupi Keithel Market and Block A & B of Shopping Complex at Imphal, for PWD, Manipur. Total Area constructed : 27,898 Sq. mt.
 
Construction of Medica Hospital at Mukundapur, Kolkata, West BengaL for M/s. Infinity Devcon Pvt Ltd. Total Builtup Area : 300,000 sq.ft.
 
We have also constructed  two nos. of Jetty at Kawkdip and a Gangway Pontoon Jetty at Raichak for West Bengal Surface Transport Corporation Ltd., Calcutta.
 
We have installed bored piles as well as constructed a Gangway Pontoon Jetty (flexible type) with fixed approach  for West Bengal Surface Transport Corporation Ltd. 
 
Design and Construction of 18.0 MLD water treatment plant on Turn-Key basis at Waithoupat water supply scheme in Thoubal district, Manipur for PHED, Manipur. 
 
Construction of Sewerage Treatment Plant – 18/27 MLD at Lamphelpat for Govt. of Manipur. 
 
We have empanelled with us specialists from the field of Environmental Engineering and as a company, we provide consultancy services for all Water related Pollution Control systems and measures. 
 
Our acclaim in this highly technical field is also via a family held company namely "Geo Miller & Co. Ltd."
 
SIMPLEX PROJ (BSE)  
Range:
1d
5d
3m
6m
1y
2y
5y
Type:
Bar
|
Line
|
Candle
Scale:
Linear
|
Log
 
 
Our FinancialData
 
  ANNUAL ACCOUNTS 2019-20    
Download
 
  ANNUAL ACCOUNTS 2018-19    
Download
 
  ANNUAL ACCOUNTS 2017-18    
Download
 
  SIMPLEX AGRI ANNUAL ACCOUNTS 2016-17 (SUBSIDIARY COMPANY)    
Download
 
  ANNUAL ACCOUNTS 2016-17    
Download
 
  ANNUAL ACCOUNTS 2015-16    
Download
 
  ANNUAL ACCOUNTS 2014-15    
Download
 
  ANNUAL ACCOUNTS 2013-14    
Download
 
  ANNUAL ACCOUNTS 2012-13    
Download
 
  ANNUAL ACCOUNTS 2011-12    
Download
 
  ANNUAL ACCOUNTS 2010-11    
Download
 
  ANNUAL ACCOUNTS 2009-10    
Download
 
  ANNUAL ACCOUNTS 2008/09    
Download
 
1 2 3
  AUDITED STANDALONE MARCH 2019    
Download
 
  UNAUDITED DECEMBER 2018    
Download
 
  UNAUDITED SEPTEMBER 2018    
Download
 
  UNAUDITED JUNE 2018    
Download
 
  AUDITED CONSOLDATED MARCH 2018    
Download
 
  AUDITED STANDALONE MARCH 2018    
Download
 
  UNAUDITED DECEMBER 2017    
Download
 
  UNAUDITED SEPTEMBER 2017    
Download
 
  UNAUDITED JUNE 2017    
Download
 
  AUDITED MARCH 2017    
Download
 
  UNAUDITED DECEMBER 2016    
Download
 
  UNAUDITED SEPTEMBER 2016    
Download
 
  UNAUDITED JUNE 2016    
Download
 
  AUDITED MARCH 2016    
Download
 
  UNAUDITED DECEMBER 2015    
Download
 
  UNAUDITED SEPTEMBER 2015    
Download
 
  UNAUDITED JUNE 2015    
Download
 
  AUDITED MARCH 2015    
Download
 
  UNAUDITED DECEMBER 2014    
Download
 
  UNAUDITED SEPTEMBER 2014    
Download
 
  UNAUDITED JUNE 2014    
Download
 
  AUDITED MARCH 2014    
Download
 
  UNAUDITED DECEMBER 2013    
Download
 
  UNAUDITED SEPTEMBER 2013    
Download
 
  UNAUDITED JUNE 2013    
Download
 
  AUDITED MARCH 2013    
Download
 
  UNAUDITED DECEMBER 2012    
Download
 
  UNAUDITED SEPTEMBER 2012    
Download
 
  UNAUDITED JUNE 2012    
Download
 
  AUDITED MARCH 2012    
Download
 
  UNAUDITED DECEMBER 2011    
Download
 
  UNAUDITED SEPTEMBER 2011    
Download
 
  UNAUDITED JUNE 2011    
Download
 
  AUDITED MARCH 2011    
Download
 
  UNAUDITED SEPTEMBER 2010    
Download
 
  UNAUDITED JUNE 2010    
Download
 
  AUDITED MARCH 2010    
Download
 
  UNAUDITED DECEMBER 2009    
Download
 
  UNAUDITED JUNE 2009    
Download
 
  UNAUDITED DECEMBER 2008    
Download
 
  UNAUDITED SEPTEMBER 2008    
Download
 
  UNAUDITED JUNE 2008    
Download
 
  AUDITED MARCH 2008    
Download
 
  UNAUDITED DECEMBER 2007    
Download
 
1 2 3 4 5 6 7 8 9
 
 
Our Shareholding Data
 
 
 
Our Corporate Governance Data
 

Code of Conduct for Prevention of Insider Trading

The Securities and Exchange Board of India (SEBI) has notified the SEBI (Prohibition of Insider Trading) Regulations, 1992, as amended from time to time by SEBI (Insider Trading) (Amendment) Regulations (hereinafter referred to as "Regulations") dealing, inter alia, with buying and selling of securities of the Company by employees / directors.
 

In line with the said Regulations, the following amended Code of Conduct for prevention of Insider Trading (hereinafter referred to as the ‘Code’) was adopted by the Board of Directors of the Company at its meeting held on 30th May, 2014. The detailed revised Code is given below:
 

Objective

The Company endeavors to preserve the confidentiality of un-published price sensitive information and to prevent misuse of such information. The Company is committed to transparency and fairness in dealing with all stakeholders and in ensuring adherence to all laws and regulations. Every Director, Officer, Designated Employee and Connected person of the Company has a duty to safeguard the confidentiality of all such information obtained in the course of his or her work at the Company. No Director, Officer, Designated Employee may use his or her position or knowledge of the Company to gain personal benefit or to provide benefit to any third party. Such persons are prohibited from communicating / or counseling others with respect to the securities of the Company. Such persons should also refrain from profiteering by misusing the unpublished price sensitive information and thereby enabling the Company to retain investor confidence.

To achieve these objectives, Simplex Projects Limited (hereinafter referred to as “the Company”) hereby notifies that this code of conduct is to be followed by all Directors, Officers, Designated Employees and connected persons. .....(Contd.)

         
         
  Download or Open PDF File to read more....    
Open
Download
 
  Report    
Download
 
 
Our Investors' Information
 
  SPL BM NOTICE 05.07.2021    
Download
 
  AGM NOTICE 2020    
Download
 
  SPL BM NOTICE 06.04.2021    
Download
 
  SPL BM NOTICE 26.02.2021    
Download
 
  SPL BM NOTICE 22.01.2021    
Download
 
  SPL BM NOTICE 08.09.2020    
Download
 
  SPL BM NOTICE 07.08.2020    
Download
 
  SPL BM NOTICE 29.06.2020    
Download
 
  AGM NOTICE 2019    
Download
 
  SPL BM NOTICE 31-01-2020    
Download
 
  SPL BM NOTICE 22-10-2019    
Download
 
  SPL BM NOTICE 09-09-2019    
Download
 
  SPL BM NOTICE 05-08-2019    
Download
 
  SPL BM NOTICE 20-05-2019    
Download
 
  ADDENDUM TO NOTICE OF AGM 2018    
Download
 
  AGM 2018 NOTICE    
Download
 
  SPL BM NOTICE 09-04-2019    
Download
 
  SPL BM NOTICE 29-11-2018    
Download
 
  SPL BM NOTICE 30-05-2018    
Download
 
  SPL BM NOTICE 14-02-2018    
Download
 
  SPL BM NOTICE 05-01-2018    
Download
 
  SPL BM NOTICE 14-12-2017    
Download
 
  CORRIGENDUM TO NOTICE OF AGM 2017    
Download
 
  SPL BM NOTICE 14-09-2017    
Download
 
  AGM 2017 NOTICE    
Download
 
  SPL BM Notice 14-08-2017    
Download
 
  SPL BM Notice 12-06-2017    
Download
 
  SPL BM Notice 30-05-2017    
Download
 
  SPL BM Notice 14-02-2017    
Download
 
  AGM 2016 NOTICE    
Download
 
  SPL- BM NOTICE 09 December 2016    
Download
 
  SPL- BM NOTICE 14 November 2016    
Download
 
  BM NOTICE 12 August 2016    
Download
 
  BM NOTICE 30 May 2016    
Download
 
  BM NOTICE 12 Feb 2016    
Download
 
  AGM 2015 NOTICE    
Download
 
  AGM 2014 NOTICE    
Download
 
  AGM 2013 NOTICE    
Download
 
  AGM 2012 NOTICE    
Download
 
  AGM 2011 NOTICE     
Download
 
  AGM 2010 NOTICE    
Download
 
  POSTAL BALLOT NOTICE    
Download
 
  AGM 2009 NOTICE    
Download
 
  AGM 2008 NOTICE    
Download
 
1 2 3 4 5 6 7 8 9
  Familarization Programme 2019-20    
Download
 
  E VOTING RESULTS 2019    
Download
 
  Intimation of Change in designation of Mr. Sudarshan Das Mundhra From Whole Time Director and CFO to Managing Director and CFO    
Download
 
  Intimation of Change in designation of Mr. Balkrishandas Mundhra from Chairman & Managing Director to Non Executive and Non Independent Director and C    
Download
 
  Resignation of Keshva Das Mundhra - Independent Director    
Download
 
  CODE-OF-FAIR-DISCLOSURE-FOR-UNPUBLISHED-PRICE-SENSITIVE-INFORMATION.    
Download
 
  ANTI SEXUAL HARASSMENT POLICY    
Download
 
  RESIGNATION OF DIRECTOR- MR. J. K. BAGRI    
Download
 
  RESIGNATION OF DIRECTOR (N JHANWAR)    
Download
 
  Familarisation Program 2018-19    
Download
 
  APPOINTMENT OF COMPANY SECRETARY    
Download
 
  APPOINTMENT OF CHIEF FINANCIAL OFFICER    
Download
 
  APPOINTMENT LETTER- B N THAKUR    
Download
 
  VOTING RESULTS 2017    
Download
 
  RESIGNATION OF DIRECTOR    
Download
 
  SPL FAMILARISATION PROGRAM    
Download
 
  E VOTING RESULTS 2016    
Download
 
  E VOTING RESULTS 2015    
Download
 
  BALLOT FORM 2015    
Download
 
  ATTENDANCE SLIP 2015    
Download
 
  PROXY FORM 2015    
Download
 
  REMUNERATION POLICY    
Download
 
  RISK MANAGEMENT POLICY    
Download
 
  POLICY FOR DETERMINING MATERIAL SUBSIDIARIES    
Download
 
  CODE OF CONDUCT FOR BOARD MEMBERS AND SENIOR MANAGEMENT PERSONNEL    
Download
 
  RELATED PARTY TRANSACTION POLICY    
Download
 
  TERMS OF APPOINTMENT    
Download
 
  VIGIL MECHANISM    
Download
 
  ECS MANDATE FORM    
Download
 
1 2 3 4 5 6
  Postal Ballot    
Open
Download
  UNCLAIMED DIVIDEND 2011    
Download
 
  UNCLAIMED DIVIDEND 2010    
Download
 
  UNCLAIMED DIVIDEND 2009    
Download
 
  UNCLAIMED DIVIDEND 2008    
Download
 

Investors correspondence may be addressed to :

Company Secretary & Compliance Officer :

Simplex Projects Limited

12/1, Nellie Sengupta Sarani,

Kolkata 700087

Tel :- +91-33- 32923330

Fax:- +91-33- 22528013

Email ID: investors@simplexprojects.com


Warning: mysql_connect(): Access denied for user 'simpl2ju_ssca'@'localhost' (using password: YES) in /var/www/vhosts/simplexprojects.com/httpdocs/pages/pg-investors.php on line 1548

Warning: mysqli_close() expects parameter 1 to be mysqli, boolean given in /var/www/vhosts/simplexprojects.com/httpdocs/pages/pg-investors.php on line 1556
  REGLATION_30    
Download
 
  COMMITTEES OF THE BOARD    
Download
 
  POLICY FOR PRESERVATION OF DOCUMENTS    
Download
 
  POLICY FOR DETERMINATION OF MATERIALITY    
Download
 
  WINDING UP NOTICE 2    
Download
 
  WINDING UP NOTICE 1    
Download
 
 
 
Core Activities

+ Piling and Foundation work
+ Soil Investigation and recommendation
+ Soil Densification work - sand piles, stone columns, dynamic compaction.
+ Sheet Piling
+ Heavy RCC and pre-stressed concrete foundation works
+ Basement Structures
+ Pile foundation - cast-in-situ driven,
+ Bored, precast and stee

 
Specialisation

+ Car Parking Systems
+ Bridges and Flyovers/reinforced and pre-stressed Industrial Structures
+ Long Span Structure-steel & prestressed concrete

 
Niche Area

+ Multistoried Buildings
+ Townships, Group Housing Design & Construction.
+ Commercial buildings Complexes
+ Water, Waste and Sewage Treatment Plants

 
Services

+ Large span and/or high-rise commercial,
+ industrial and specialty building Projects,
+ Structural engineering, design & construction management
+ On lumpsum and cost plus basis Design & Build
+ Automated design and estimation processes
+ Large team of trained work force for executing complex structures
+ Mobile, site-based ready mix concrete
+ manufacturing facilities

 

+ Analysis and design of elements and systems
+ Automated analysis, design and drafting
+ Customized design solutions
+ Understanding and advising clients
+ Structural management

 

+ Design management and co-ordination
+ System selection for fast-track construction
+ Planning of activities, costs and time schedules
+ Quality and Safety Management
+ Management Information System.

 
 
 
Milestones of Achievement
 
1990

Incorporation
Commercial Operation

1992
1994

Soil and Foundation Engineers
Completed Housing Project

1997
2001

First Project
Award of Project

2003
2004

Turnover Crossing Rs. 500 mn
Completion of Taratala Flyover

2006
2007

Stock Exchange
Libya

2008
Timeline
      
Achievements
Mouse Move on achivements
 
Milestones of Achievement
 
Construction of Fully Automated Multi level Car Parking System.
  Construction of Fully Automated Multi level Car Parking System on Double Curvature for the First Time in the World (1st Phase).  
Construction of the first housing complex using Aarding \\\'Tunnel Shuttering\\\' technology in the country.
  Construction of the first housing complex using Aarding \'Tunnel Shuttering\' technology in the country.
Construction of Basement using Top Down Construction Technique.
  Construction of Basement using Top Down Construction Technique for the First Time in India (project under construction).  
Construction of 2000 mm dia pile foundation for the first time in India.
  Construction of 2000 mm dia pile foundation for the first time in India.
Construction of the largest Two-Tier Overhead Tank of 6000 M³ Capacity in India.
  Construction of the largest Two-Tier Overhead Tank of 6000 M³ Capacity in India.  
Construction of Rail Over Bridge (ROB) with 50 mts.
  Construction of Rail Over Bridge (ROB) with 50 mts. span P. S. C Girder over live and running electrified section of rail-track for the first time in India.
Construction of Fully Automated Underground Multilevel Car Parking Systems for the First Time in India (2nd Phase).
  Construction of Fully Automated Underground Multilevel Car Parking Systems for the First Time in India (2nd Phase).  
Libyan government awards Rs2,000-crore housing contract to Simplex Projects
  Libyan government awards Rs2,000-crore housing contract to Simplex Projects
 
 
Our Valued Clientele
 
 
  • DLF Ltd.
  • Unitech Ltd.
  • Arihant Foundations & Housing Ltd
  • Shapoorji Pallonji & Co. Ltd.
  • Dhunseri Petrochem & Tea Limited
  • Hill Cement Co Ltd
  • MEDICA Hospital Pvt Ltd
  • KAZ Story Service Infrastructure Pvt Ltd.
 
  • Tata Iron & Steel Co. Ltd.
  • Bengal Ambuja Housing Dev. Ltd.
  • China Railway Shisiju Group Corporation
  • Bihar Caustic & Chemicals Ltd
  • Gamuda-WCT India Pvt ltd
  • International Society for Krishna Consciousness
  • Power Grid Corporation of India Ltd
 
  • Siemens Ltd.
  • Nagarjuna Constructions Company Ltd.
  • OMAXE Infrastructure and Construction (P) Ltd
  • BRAHMAPUTRA CRACKERS AND POLYMER LIMITED
  • GEO MILLER & CO PVT LTD
  • Larsen & Tourbo Ltd.
  • Sandvik Asia Ltd.
 
 
 
  • IRCON
  • Bharat Heavy Electricals Ltd.
  • Central Government Employees Welfare Housing Organisation
  • Bihar Rajya Pul Nirman Nigam Ltd
  • Indian Oil Corporation Ltd.
  • Kolkata Metropolitan Development Authority
  • Municipal Corporation of Delhi
  • Public Health Engineering Department
  • West Bengal Surface Transport Corporation Ltd
 
  • State Bank Of India
  • WBPCB
  • HSCC (India) Limited
  • Central Public Works Department
  • Kolkata Municipal Corporation
  • Konkan Railway Corporation Ltd
  • National Buildings Construction Corporation Ltd
  • Uttar Pradesh Rajkiya Nirman Ltd
  • Govt of Libya ODAC
 
  • All India Radio
  • Indian Railway
  • Uttar Pradesh State Electric Board
  • Directorate Technical Education Sikkim
  • Kolkata Improvement Trust
  • Military Engineering Services
  • New Delhi Municipal Council
  • West Bengal Housing Board
  • Institute of Neuro Sciences
 
 
Career build with us
 
 
The company is continuously searching and identifying new talents for associating with them for marketing and development of their systems locally.
 
Currently we have following vacancies
 
 
 
 
 
 
News Updates
 
 
 
 
RSS NEWS
 
Fetured News
 
Flyover at clogged crossroads – Calcutta – Story

  The state government has started work on a flyover at the Dunlop crossing to allow vehicles from Dakshineswar and the other side of the Hooghly smoother access to BT Road.

The 640m flyover is scheduled to be ready by 2011. The cost of the project has been estimated at Rs 37.56 crore.

The state public works department (PWD) has awarded the contract to Simplex Projects Limited, which built the parking plazas on Rawdon Street and Lindsay Street.

“The flyover will have two lanes open to one-way traffic. Only vehicles moving towards Calcutta along PWD Road will be allowed on it. Vehicles leaving Calcutta will have to use the road,” said PWD minister Kshiti Goswami.

PWD Road is a vital link between the city and the districts. Vehicles from other states also take the route to the city.

Calcutta-bound traffic on the stretch is often stuck for several minutes at the Dunlop crossing.

Portions of PWD Road are now being barricaded for the flyover project. “The construction will start in February. If all goes well, the flyover will be opened by January 2011,” said the chairman and managing director of Simplex Projects, B.K. Mundra.

According to the site engineer of the project, Sanjib Das, the flyover will ascend from Ashokgarh. It will take a right turn and descend near the first gate of the Indian Statistical Institute. The flyover will be about 8.5 metres wide.

Encroachments like cow sheds and shanties and heavy traffic, particularly lorries from north India, on PWD Road had forced the authorities to plan the flyover. Commissioning of Nivedita Setu and segregation of goods traffic have since decongested the road somewhat.

Some engineers in the PWD roads wing feel the interchange flyover is no longer necessary with goods traffic being diverted to the Belghoria Expressway. According to them, those who travel to the city from North 24-Parganas, Hooghly, Howrah and Burdwan would have benefited more from a flyover at the Shyambazar five-point crossing.

A vehicle has to wait about eight minutes at the Dunlop crossing for the traffic light to turn green, said an engineer. Reaching APC Road, RG Kar Road or Bhupen Bose Avenue takes much longer.

There are five signals between Tallah bridge and the Shyambazar crossing, hence a motorist takes about 20 minutes to cover the short stretch.

    

 
Archive
2009
2008
 
Older Post
 
Simplex Projects News
Flyover at clogged crossroads – Calcutta – Story
Simplex bags contract worth Rs. 750 million
Simplex Projects bags Rs 2,000 crore Libyan job
Libyan government awards Rs2,000-crore housing contract to Simplex Projects
 
Recent Posts
Flyover at clogged crossroads – Calcutta – Story
Simplex bags contract worth Rs. 750 million
Simplex Projects bags Rs 2,000 crore Libyan job
 
Archives
2009
2008
 
 
Leave Your Comment
Name:(required)
Mail:(will not Publish) (required)
Web Url:
Comment:
 
   
 
 
 
Mail Page
rss
Join Newsletter

Home

Site Map

Contact

History

Corporate Info

Projects

Investors Area

Activities and Services

Achievements

Clientele

Career

Gallery

Login

News

Blog

NCLT ORDER & CIRP

Download Profile Download Profile
Complete the details below to send a link to this page below:
http://www.simplexprojects.com
 
*Your Name:
*Your Mail Id:
   
*email 1:
email 2:
email 3:
The email that will be sent to will contain your name & email address.
 

dress bustle beautystic special occasion

how much are new teen sex doll?

unquestionably the the watchmaking industry alcohol in considered the first step toward best replica watches for sale in usa.